SITE & ANALYZE
1
2
Siting analysis can be time consuming and expensive. Enverus Power & Renewables solutions help you quickly identify the most promising locations for your projects.
Nearly 80% of projects in the queue do not make it to commercial operations. Investors need to understand where competing projects are and what the siting suggests about the likelihood of eventual project success.
Save time screening sites
Maximize profitability
Immediate access to land ownership details
Siting projects in areas with favorable LMPs means higher revenue potential. With Enverus Power & Renewables solutions, you can quickly and accurately identify areas with the highest power pricing, maximizing your returns and outpacing your competition.
Find the highest power prices
Understand drivers of pricing
Minimize risks from volatility
Assess future locational risks
Reduce due diligence costs
Reduce risk with full-scale studies
Elevate your project success by leveraging ATC for precise point of interconnection (POI) selection, ensuring heightened confidence in your site choices. Uncover the most dynamic POIs over specific timeframes and the reasons influencing ATC, empowering strategic decision-making for optimal project outcomes.
Find Optimal Project Sites
Avoid Risky POI
Reduce Injection Study Costs
Find power storage opportunities
Maximize project potential
Assess risks from nearby power development
Over the last seven days, the Enverus ERCOT P&R forecast has accurately predicted the 630__B constraint (KLNSW-HHSTH 138 kv with contingency DSALKLN5) in ERCOT. While it is fundamentally driven by high wind and solar generation, there were two transmission outages...
For much of March, the California Independent System Operator (CAISO) experienced significant fluctuations in power prices due to congestion, transmission outages and bearish pricing trends in SP-15. My team used Panorama to better understand and the Power Market Publications in...
Available transfer capacity (ATC) refers to the remaining power transfer capability within a transmission network. It represents the maximum amount of power that can be transmitted over a transmission line without compromising grid reliability and stability.
Geothermal energy in the U.S. is gaining ground, thanks to initiatives like the Enhanced Geothermal Shot which aims to reduce Enhanced Geothermal Systems (EGS) costs 90% to $45/MWh by 2035.
As solar generation continues to dominate the renewable energy industry, siting projects is becoming increasingly difficult.
In the rapidly evolving landscape of the power market, the interconnection queue stands as at a critical juncture for new energy projects seeking to integrate with the existing grid infrastructure.
Discover
About Enverus
Resources
Follow Us
© Copyright 2024 All data and information are provided “as is”.
We’ll follow up right away to show you a quick product tour.